MSC Caledonia Retrofitted with BIO-SEA BWTS
MSC Caledonia II, formerly named Caledonia has been retrofitted with a BIO-SEA ballast water treatment system in a scope of supply that marks the successful completion of BIO-UV Group’s first full turnkey BWTS project.
“The lead time for engineering, system building, and final installation and commissioning was very tight due to the vessel’s schedule. But the pre-installation engineering work we carried out allowed the customer to prefabricate the piping elements, significantly reducing installation and drydock time.”
Florian Cortes, BIO-SEA by BIO-UV Group Technical Director